you.
ladddr.
← All work

Case study · b2b saas founder

Shutttr.

Figma prototype to shipped MVP, no critical bugs.

Client
b2b saas founder
Scope
end-to-end mvp
Timeline
5 weeks
Dates
09.2024 – 11.2024
Shutttr website preview

The challenge.

The founder needed to turn a shuttle booking concept into a working product quickly, with the core tools for both passengers and drivers.

What we did.

We moved from prototype to a focused MVP, building booking, seat selection, checkout, authentication, and driver operations as one connected experience.

  1. 01Took a shuttle booking SaaS from Figma prototype to shipped MVP in five weeks.
  2. 02Built auth, a real-time seat map, Stripe checkout, and driver admin panel.
  3. 03Completed browser, mobile, and accessibility QA with zero critical launch bugs.
  • next.js
  • prisma
  • postgres
  • stripe
  • shadcn
  • resend

The outcome.

A production-ready MVP delivered in five weeks, with zero critical bugs at launch.